How sources are used
Official records are used to confirm facts. Company materials show what a developer says or plans, not what has happened.

Transparent evidence
The records behind ADCW project profiles and verified listings, organized so you can check the evidence yourself.
Official records are used to confirm facts. Company materials show what a developer says or plans, not what has happened.
The source directory covers every published project record. The data centre issues overview connects recurring public-interest questions to the official records that help answer them.
Source policy
ADCW checks municipal, regulatory, government, utility, and developer documents first. News reporting is used for context and research leads.
A facility can qualify whether its workload is AI, high-performance computing, colocation, cryptocurrency or mixed. ADCW applies one evidence standard to the physical footprint, then labels the workload supported by the record.
A permit, a company statement, and an operating result are different things. Approval for a power project does not necessarily approve the data centre.
Missing, conflicting, or unresolved information is clearly labelled. It is not counted as zero or left out without explanation.
Before publishing a project, ADCW checks its identity, status, location, and supporting sources.
ADCW looks for the power source, emissions, cooling technology, water demand and source, wastewater, stormwater, chemicals, fuel storage, batteries, nearby receptors, mitigation, monitoring and emergency-response information identified in Alberta's guidance for data centre proponents. The guidance describes information proponents should be prepared to provide to regulators; it does not mean every item is automatically public or approved.
This inventory is the best public record ADCW can build, not a complete list. Alberta has no single registry for every data centre project, and public information changes over time.
Source directory
Links open the original source. Access and publication dates are shown when available.
Municipal District of Greenview No. 16
Municipal District of Greenview No. 16 · Verified listing source · Verified 2026-09-13
Municipal District of Greenview No. 16 · Verified listing source · Verified 2026-09-13
Municipal District of Greenview No. 16 · Verified listing source · Verified 2026-09-13
Municipal District of Greenview No. 16 · Verified listing source · Verified 2026-09-13
Municipal District of Greenview No. 16 · Verified listing source · Verified 2026-09-13
Municipal District of Greenview No. 16 · Verified listing source · Verified 2026-09-13
City of Edmonton
4WEB · Verified listing source · Verified 2026-09-01
EPCOR · Verified listing source · Verified 2026-09-01
Red Deer County
Red Deer County · Municipal record · 2025-10-07
Red Deer County · Municipal record · 2025-10-07
Government of Alberta Major Projects · Government database · Accessed 2026-09-07
Havenz Smart Communities · Company disclosure · Accessed 2026-09-07
Havenz Smart Communities · Company disclosure · 2026-02-24
Energy Haven · Company disclosure · Accessed 2026-09-07
Government of Canada Open Government Portal · Government database · Modified 2026-06-29
Lacombe County
Lacombe County · Municipal record · 2026-08-27
Lacombe County · Municipal record · Meeting scheduled 2026-08-27
Lacombe County · Municipal record · Accessed 2026-09-29
Nowlit Solutions Corp. · Company disclosure · Accessed 2026-09-29
Armada Nowlit · Company disclosure · Accessed 2026-08-25
Nowlit · Company disclosure · Accessed 2026-08-25
Alberta Utilities Commission · Regulator · Accessed 2026-08-25
Lacombe County · Municipal record · Accessed 2026-09-27
Government of Alberta Major Projects · Government database · Accessed 2026-08-25
Innovation, Science and Economic Development Canada · Government database · April 2025 notification; accessed 2026-08-25
Government of Alberta · Government database · Updated February 2026
Government of Canada Open Government Portal · Government database · Modified 2026-06-29
Municipal District of Opportunity No. 17
Bigstone Cree Nation / Alberta Utilities Commission · Intervener evidence · Undated; reviewed November 5, 2026
Municipal District of Opportunity No. 17 · Municipal record · 2025-03-26
Nowlit Solutions Corp. · Company disclosure · Accessed 2026-08-31
Alberta Utilities Commission · Regulator · 2025-12-23
Alberta Utilities Commission · Regulator · 2026-05-07
Armada Nowlit Energy Ltd. / Alberta Utilities Commission · Regulatory filing · 2026-09-14
Alberta Utilities Commission · Regulator · 2026-09-14
Calvin Consulting Group Ltd. / Alberta Utilities Commission · Regulatory filing · 2026-07-13
Armada Nowlit Energy Ltd. / Alberta Utilities Commission · Regulatory filing · 2026-09-14
WSP Canada Inc. / Alberta Utilities Commission · Regulatory filing · 2026-09-11
VL Energy Ltd. / Alberta Utilities Commission · Regulatory filing · 2026-09-14
ACI Acoustical Consultants Inc. / Alberta Utilities Commission · Regulatory filing · 2026-10-16
Armada Nowlit Energy Ltd. / Alberta Utilities Commission · Regulatory filing · 2026-08-25
Court of King's Bench of Alberta, hosted by PwC · Court decision · 2025-03-25
PricewaterhouseCoopers Inc., trustee for Sequoia Resources · Court filing · 2025-04-01
Government of Alberta · Government database · Accessed 2026-08-31
Bigstone Cree Nation · Government database · Accessed 2026-08-31
Kneehill County
Kneehill County · Verified listing source · Verified 2026-09-16
Alberta Utilities Commission · Verified listing source · Verified 2026-09-16
Alberta Utilities Commission · Verified listing source · Verified 2026-09-16
Alberta Energy Regulator / Alberta Geological Survey · Verified listing source · Verified 2026-09-16
Bantry region
AVAX One Technology Ltd. · Verified listing source · Verified 2026-11-03
City of Chestermere
City of Chestermere · Municipal record · Accessed 2026-11-03
City of Chestermere · Municipal record · 2025-02-27
Beacon Data Centers / City of Chestermere · Company disclosure · Presented 2025-02-25
City of Chestermere · Municipal record · 2025-03-18
City of Chestermere · Municipal record · 2025-03-11
City of Chestermere · Municipal record · Passed 2025-04-01
City of Chestermere · Municipal record · 2025-04-01
City of Chestermere · Municipal record · Updated through 2026-09-01; accessed 2026-09-07
Government of Alberta Major Projects · Government database · Accessed 2026-09-07
Alberta Electric System Operator · Regulator · Accessed 2026-09-07
Government of Canada Open Government Portal · Government database · Modified 2026-06-29
Foothills County
Foothills County · Municipal record · 2025-01
Foothills County · Municipal record · 2025-01-29
Foothills County · Municipal record · 2025-02-26
Foothills County · Municipal record · Amended 2025-02-26
Foothills County · Municipal record · Accessed 2026-08-23
Government of Alberta Major Projects · Government database · Accessed 2026-08-23
Alberta Electric System Operator · Regulator · October 2026 list; updated 2026-10-09; accessed 2026-11-03
Government of Canada Open Government Portal · Government database · Modified 2026-06-29
Parkland County
Alberta Electric System Operator · Verified listing source · Verified 2026-09-04
Government of Alberta Major Projects · Verified listing source · Verified 2026-09-04
Data Center Map · Verified listing source · Verified 2026-09-04
Beacon AI Centers / Business Wire · Verified listing source · Verified 2026-09-04
The Logic · Verified listing source · Verified 2026-09-04
Alberta Electric System Operator · Verified listing source · Verified 2026-09-04
Sturgeon County
Sturgeon County · Municipal record · 2026-08-28
Sturgeon County · Municipal record · 2026-10-22
Heartland Power Generation LP / Impact Assessment Agency of Canada · Federal filing · 2025-12-28
Alberta Utilities Commission · Regulator · 2026-10-23
Alberta Utilities Commission · Regulator · 2026-10-23
Alberta Utilities Commission · Regulator · Updated through 2026-08-04
Heartland Power Generation LP / Alberta Utilities Commission · Regulatory filing · 2025-12-19
Alberta Utilities Commission · Regulator · 2026-03-27
Stantec for Heartland Power Generation LP / Alberta Utilities Commission · Regulatory filing · 2025-12
Alberta Utilities Commission · Regulator · 2026-08-07
Samson Cree Nation / Alberta Utilities Commission · Regulatory filing · 2026-07-30
Heartland Power Generation LP / Impact Assessment Agency of Canada · Federal filing · 2025-12-14
Stantec for Heartland Power Generation LP / Impact Assessment Agency of Canada · Federal filing · 2025-12-09
Impact Assessment Agency of Canada · Federal filing · 2026-02
Heartland Power Generation LP / Impact Assessment Agency of Canada · Federal filing · 2026-02-25
Impact Assessment Agency of Canada · Regulator · 2026-03-10
Environment and Climate Change Canada · Federal filing · 2026-01-23
Health Canada · Federal filing · 2026-01
Impact Assessment Agency of Canada · Federal filing · Updated through 2026-07
Sturgeon County · Municipal record · Updated through 2026-08
Sturgeon County · Municipal record · Accessed 2026-08-19
Beacon Data Centers · Company disclosure · Accessed 2026-08-19
Government of Alberta Major Projects · Government database · Accessed 2026-08-19
Rocky View County
Alberta Utilities Commission · Regulator · Accessed 2026-11-03
Dr. Brad Stelfox for the Indus and Area Residents Group, filed with the Alberta Utilities Commission · Intervener evidence · 2026; exact filing date not independently confirmed
Rocky View County · Municipal record · Updated through July 2026
Rocky View County · Municipal record · 2025-06-17
Rocky View County · Municipal record · 2026-07-21
EXP Services and Urbanics for Rocky View County · Municipal record · 2026-08-14
Rocky View County · Municipal record · 2026-09-23
Rocky View County · Municipal record · Updated through July 2026
Impact Assessment Agency of Canada · Federal filing · 2025-12-29
Impact Assessment Agency of Canada · Federal filing · Updated through 2026-03-10
Impact Assessment Agency of Canada · Federal filing · 2026-02-05
Impact Assessment Agency of Canada · Regulator · 2026-03-10
Beacon Data Centers · Company disclosure · 2026-02
Government of Canada Open Government Portal · Government database · Modified 2026-06-29
Government of Alberta Major Projects · Government database · Accessed 2026-07-28
Beacon AI Centers / Business Wire · Company disclosure · 2025-05-15
The Logic · News reporting · 2025-05-15
Leduc County
Leduc County · Municipal record · 2024-12-10 hearing notice
Leduc County · Municipal record · 2024-12-10
Leduc County · Municipal record · Updated 2026-06-26; accessed 2026-09-11
Alberta Electric System Operator · Regulator · 2026-09-01
Government of Alberta Major Projects · Government database · Accessed 2026-09-11
Beacon Data Centers · Company disclosure · Accessed 2026-09-11
Beacon AI Centers / Business Wire · Company disclosure · 2025-05-15
Government of Canada Open Government Portal · Government database · Modified 2026-06-29
Municipal District of Greenview No. 16
Bitdeer Technologies Group · Company disclosure · 2026-06-02
Bitdeer Technologies Group · Company disclosure · 2026-08-10
Alberta Utilities Commission · Regulator · 2025
Government of Alberta Major Projects · Government database · Accessed 2026-08-21
Government of Canada Open Government Portal · Government database · Modified 2026-06-29
Parkland County
Parkland County · Municipal record · Updated 2026-10-29; checked 2026-10-29
Boreal Technology Hub / BGRE · Company disclosure · Capacity, investment, jobs, and engagement checked 2026-10-29
Alberta Electric System Operator · Regulator · Checked 2026-08-31
Alberta Electric System Operator · Regulator · 2026-08-05; rows 105, 171, and 185
TransAlta · Company disclosure · Undated; checked 2026-08-31
TransAlta · Company disclosure · 2026-02-27
TransAlta · Company disclosure · 2026-07-30
TransAlta · Company disclosure · Checked 2026-08-31
Government of Canada Open Government Portal · Government database · Modified 2026-06-29
Boreal Technology Hub / BGRE · Company disclosure · Checked 2026-10-29
Boreal Technology Hub / BGRE · Company disclosure · Materials index checked 2026-10-18
Boreal Technology Hub / BGRE · Company disclosure · 2026-10-07; checked 2026-10-19
Alberta Utilities Commission · Regulator · 2026-10-07
TransAlta Corporation · Regulatory filing · Checked 2026-10-19
WSP for TransAlta Corporation · Regulatory filing · 2026-04-09
WSP for TransAlta Corporation · Regulatory filing · 2025-12-08
Dr. Amir Hakami and Dr. Burak Oztaner for LSAMCA · Intervener evidence · 2026; checked 2026-10-19
Lac Ste. Anne Métis Community Association · Intervener evidence · 2026-06-18
City of Calgary
Cologix · Verified listing source · Verified 2026-09-01
Cologix · Verified listing source · Verified 2026-09-01
ENMAX Power · Verified listing source · Verified 2026-09-01
Brazeau County
Government of Alberta Major Projects · Verified listing source · Verified 2026-09-03
KALiNA Distributed Power / Crusoe · Verified listing source · Verified 2026-09-03
KALiNA Power · Verified listing source · Verified 2026-09-03
Alberta Electric System Operator · Verified listing source · Verified 2026-09-03
Rocky View County
KALiNA Power Limited · Verified listing source · Verified 2026-08-20
Government of Alberta Major Projects · Verified listing source · Verified 2026-08-20
KALiNA Distributed Power / Crusoe · Verified listing source · Verified 2026-08-20
Rocky View County · Verified listing source · Verified 2026-08-20
Alberta Electric System Operator · Verified listing source · Verified 2026-08-20
Red Deer County
Government of Alberta Major Projects · Verified listing source · Verified 2026-09-03
KALiNA Distributed Power / Crusoe · Verified listing source · Verified 2026-09-03
KALiNA Power · Verified listing source · Verified 2026-09-03
Alberta Electric System Operator · Verified listing source · Verified 2026-09-03
Bonnyville region
Government of Alberta Major Projects · Verified listing source · Verified 2026-09-13
Invest Alberta · Verified listing source · Verified 2026-09-13
Town of Olds
Town of Olds · Verified listing source · Verified 2026-09-13
Town of Olds · Verified listing source · Verified 2026-09-13
Technologies New Energy · Verified listing source · Verified 2026-09-13
Invest Alberta · Verified listing source · Verified 2026-09-13
Government of Alberta Major Projects · Verified listing source · Verified 2026-09-13
City of Calgary
DataHive · Verified listing source · Verified 2026-07-31
Cologix · Verified listing source · Verified 2026-07-31
ENMAX Power · Verified listing source · Verified 2026-07-31
City of Edmonton
City of Edmonton · Verified listing source · Verified 2026-10-25
City of Edmonton · Verified listing source · Verified 2026-10-25
County of Grande Prairie No. 1
County of Grande Prairie · Verified listing source · Verified 2026-10-19
County of Grande Prairie · Verified listing source · Verified 2026-10-19
County of Grande Prairie · Verified listing source · Verified 2026-10-19
County of Grande Prairie · Verified listing source · Verified 2026-10-19
County of Grande Prairie · Verified listing source · Verified 2026-10-19
County of Grande Prairie · Verified listing source · Verified 2026-10-19
Town & Country News / Local Journalism Initiative · Verified listing source · Verified 2026-10-19
City of Calgary
Equinix · Verified listing source · Verified 2026-09-01
ENMAX Power · Verified listing source · Verified 2026-09-01
City of Calgary
Equinix · Verified listing source · Verified 2026-09-01
ENMAX Power · Verified listing source · Verified 2026-09-01
City of Calgary
Equinix · Verified listing source · Verified 2026-09-01
ENMAX Power · Verified listing source · Verified 2026-09-01
Government of Alberta Major Projects · Verified listing source · Verified 2026-09-01
City of Calgary
eStruxture Data Centers · Verified listing source · Verified 2026-09-01
eStruxture Data Centers · Verified listing source · Verified 2026-09-01
ENMAX Power · Verified listing source · Verified 2026-09-01
Rocky View County
eStruxture Data Centers · Verified listing source · Verified 2026-07-31
eStruxture Data Centers · Verified listing source · Verified 2026-07-31
Alberta Utilities Commission · Verified listing source · Verified 2026-07-31
Rocky View County · Verified listing source · Verified 2026-07-31
Rocky View County · Verified listing source · Verified 2026-07-31
Rocky View County
Alberta Utilities Commission · Regulator · 2026-11-02
Rocky View County, filed with the Alberta Utilities Commission · Municipal record · Filed 2026-08-28
eStruxture Data Centers, filed with the Alberta Utilities Commission · Regulatory filing · Filed 2026-08-28
eStruxture Data Centers, filed with the Alberta Utilities Commission · Regulatory filing · Filed 2026-08-28
eStruxture Data Centers, filed with the Alberta Utilities Commission · Regulatory filing · Filed 2026-08-28
eStruxture Data Centers · Company disclosure · Accessed 2026-08-27
eStruxture Data Centers · Company disclosure · Accessed 2026-08-27
eStruxture Data Centers · Company disclosure · Accessed 2026-08-27
eStruxture Data Centers · Company disclosure · 2026-05-14
eStruxture Data Centers · Company disclosure · 2024-10-29
Government of Alberta Major Projects · Government database · Accessed 2026-08-27
Rocky View County · Municipal record · 2025-06-17
Alberta Utilities Commission · Regulator · 2026-08-28
Rocky View County · Municipal record · 2025-12-04
Rocky View County · Municipal record · 2026-05-05
EXP Services and Urbanics for Rocky View County · Municipal record · 2026-08-14
Rocky View County · Municipal record · 2026-09-23
Rocky View County · Municipal record · 2025-09-18
eStruxture Data Centers · Company disclosure · 2026-05-07
Government of Canada Open Government Portal · Government database · Modified 2026-06-29
County of Newell
FingerMotion, Inc. · Verified listing source · Verified 2026-11-01
FingerMotion, Inc. · Verified listing source · Verified 2026-11-01
FingerMotion, Inc. · Verified listing source · Verified 2026-11-01
FingerMotion, Inc. · Verified listing source · Verified 2026-11-01
FingerMotion, Inc. · Verified listing source · Verified 2026-11-01
FingerMotion, Inc. · Verified listing source · Verified 2026-11-01
FingerMotion, Inc. · Verified listing source · Verified 2026-11-01
County of Newell · Verified listing source · Verified 2026-11-01
County of Newell · Verified listing source · Verified 2026-11-01
County of Newell · Verified listing source · Verified 2026-11-01
FingerMotion, Inc. · Verified listing source · Verified 2026-11-01
FingerMotion, Inc. · Verified listing source · Verified 2026-11-01
FingerMotion, Inc. · Verified listing source · Verified 2026-11-01
Town of Hanna
FingerMotion, Inc. · Verified listing source · Verified 2026-11-01
FingerMotion, Inc. · Verified listing source · Verified 2026-11-01
FingerMotion, Inc. · Verified listing source · Verified 2026-11-01
FingerMotion, Inc. · Verified listing source · Verified 2026-11-01
FingerMotion, Inc. · Verified listing source · Verified 2026-11-01
County of Stettler No. 6
Land and Property Rights Tribunal · Verified listing source · Verified 2026-09-30
County of Stettler No. 6 · Verified listing source · Verified 2026-09-30
County of Stettler No. 6 · Verified listing source · Verified 2026-09-30
Alberta Energy Regulator / Alberta Geological Survey · Verified listing source · Verified 2026-09-30
Kneehill County
Kneehill County · Verified listing source · Verified 2026-09-16
Kneehill County · Verified listing source · Verified 2026-09-16
Alberta Carbon Registries · Verified listing source · Verified 2026-09-16
Alberta Energy Regulator / Alberta Geological Survey · Verified listing source · Verified 2026-09-16
Rocky View County
Rocky View County · Verified listing source · Verified 2026-09-14
Armada Nowlit Energy / Rocky View County · Verified listing source · Verified 2026-09-14
Alberta Utilities Commission · Verified listing source · Verified 2026-09-14
Alberta Utilities Commission · Verified listing source · Verified 2026-09-14
Alberta Utilities Commission · Verified listing source · Verified 2026-09-14
Alberta Energy Regulator / Alberta Geological Survey · Verified listing source · Verified 2026-09-14
Leduc County
Capital Power · Verified listing source · Verified 2026-08-20
Capital Power · Verified listing source · Verified 2026-08-20
Alberta Electric System Operator · Verified listing source · Verified 2026-08-20
Alberta Emissions Offset Registry · Verified listing source · Verified 2026-08-20
Wheatland County
Wheatland County · Municipal record · Adopted 2026-08-11; accessed 2026-09-09
Wheatland County / WSP for Diode Ventures · Municipal record · 2026-06-03; submission letter 2026-06-01
Diode Ventures · Company disclosure · Accessed 2026-08-30
Alberta Electric System Operator · Regulator · 2026-08-05
Alberta Electric System Operator · Regulator · Updated 2026-08-05; accessed 2026-08-30
Wheatland County · Municipal record · Accessed 2026-08-30
Wheatland County / WSP for Diode Ventures · Municipal record · Cover: August 2026; County file label: 2026-09-11 Final; accessed 2026-10-08
Diode Ventures · Company disclosure · 2026-09-03; accessed 2026-10-08
Government of Alberta / Alberta Major Projects · Government database · Accessed 2026-10-08; update date not established
Government of Canada Open Government Portal · Government database · Modified 2026-06-29
Wheatland County
Government of Alberta Major Projects · Verified listing source · Verified 2026-08-20
HubOne · Verified listing source · Verified 2026-08-20
Drumheller
Hut 8 Corp. · Company disclosure · Accessed 2026-08-21
U.S. Securities and Exchange Commission · Regulatory filing · 2026-05-06
Hut 8 Corp. · Company disclosure · 2026-05-06
Datacenters.com · News reporting · Accessed 2026-08-21
Town of Drumheller · Municipal record · Accessed 2026-08-21
Medicine Hat
Hut 8 Corp. · Company disclosure · Accessed 2026-08-21
U.S. Securities and Exchange Commission · Regulatory filing · 2026-05-06
U.S. Securities and Exchange Commission · Regulatory filing · 2026-08-03
U.S. Securities and Exchange Commission · Regulatory filing · 2026-04-24
American Bitcoin Corp. · Company disclosure · Accessed 2026-08-22
City of Medicine Hat · Municipal record · 2024-10
City of Medicine Hat · Municipal record · 2021
City of Medicine Hat · Municipal record · Accessed 2026-08-21
City of Calgary
K-Tech Solutions / U.S. Securities and Exchange Commission · Verified listing source · Verified 2026-08-23
K-Tech Solutions / U.S. Securities and Exchange Commission · Verified listing source · Verified 2026-08-23
K-Tech Solutions / U.S. Securities and Exchange Commission · Verified listing source · Verified 2026-08-23
K-Tech Solutions / U.S. Securities and Exchange Commission · Verified listing source · Verified 2026-08-23
K-Tech Solutions / U.S. Securities and Exchange Commission · Verified listing source · Verified 2026-08-23
Government of Alberta Major Projects · Verified listing source · Verified 2026-08-23
Government of Alberta · Verified listing source · Verified 2026-08-23
Municipal District of Greenview No. 16
Municipal District of Greenview No. 16 · Municipal record · 2026-09-09
New West Data Acquisition Corp. / Alberta Utilities Commission · Regulatory filing · 2025-12-22
Alberta Utilities Commission · Regulator · 2026-02-12
Alberta Utilities Commission · Regulator · 2026-02-12
Rocky View County
Rocky View County · Verified listing source · Verified 2026-07-31
Kineticor · Verified listing source · Verified 2026-07-31
Yellowhead County
Government of Alberta Major Projects · Government database · Accessed 2026-08-27
Emerald Energy Technologies / Yellowhead County · Company disclosure · 2026-06-23
Yellowhead County · Municipal record · 2026-06-23
Yellowhead County · Municipal record · 2026-06-23
Alberta Electric System Operator · Regulator · Updated 2026-08-05
Alberta Utilities Commission · Regulator · Accessed 2026-08-27
Government of Alberta · Government database · Accessed 2026-08-27
Government of Canada Open Government Portal · Government database · Modified 2026-06-29
Northern Sunrise County
Alberta Utilities Commission · Regulator · Accessed 2026-07-28
Impact Assessment Agency of Canada · Federal filing · Updated through July 2026
Impact Assessment Agency of Canada · Federal filing · 2025
Impact Assessment Agency of Canada · Federal filing · 2026
Impact Assessment Agency of Canada · Federal filing · 2026-01-22
Government of Canada Open Government Portal · Government database · Modified 2026-06-29
Impact Assessment Agency of Canada · Regulator · 2026-03-03
Northern Sunrise County · Municipal record · 2026-01-21
Impact Assessment Agency of Canada · Federal filing · 2025
Government of Alberta Major Projects · Government database · Accessed 2026-07-28
County of Newell
Alberta Electric System Operator · Verified listing source · Verified 2026-09-29
County of Newell · Verified listing source · Verified 2026-09-29
County of Newell · Verified listing source · Verified 2026-09-29
County of Newell · Verified listing source · Verified 2026-09-29
County of Newell · Verified listing source · Verified 2026-09-29
County of Newell · Verified listing source · Verified 2026-09-29
Brooks Bulletin · Verified listing source · Verified 2026-09-29
Clearwater County
Alberta Utilities Commission · Verified listing source · Verified 2026-09-16
Alberta Utilities Commission · Verified listing source · Verified 2026-09-16
GlassRatner Restructuring Inc. · Verified listing source · Verified 2026-09-16
Alberta Energy Regulator / Alberta Geological Survey · Verified listing source · Verified 2026-09-16
Town of Strathmore
Prairie Sky Data Solutions · Verified listing source · Verified 2026-09-11
Town of Strathmore · Verified listing source · Verified 2026-09-11
Prairie Sky Data Solutions · Verified listing source · Verified 2026-09-11
Government of Alberta Major Projects · Verified listing source · Verified 2026-09-11
City of Calgary
Qu Data Centres · Verified listing source · Verified 2026-07-31
Qu Data Centres · Verified listing source · Verified 2026-07-31
ENMAX Power · Verified listing source · Verified 2026-07-31
Data Center Map · Verified listing source · Verified 2026-07-31
City of Calgary
Qu Data Centres · Verified listing source · Verified 2026-07-31
Qu Data Centres · Verified listing source · Verified 2026-07-31
ENMAX Power · Verified listing source · Verified 2026-07-31
Data Center Map · Verified listing source · Verified 2026-07-31
City of Airdrie
Qu Data Centres · Verified listing source · Verified 2026-07-31
Qu Data Centres · Verified listing source · Verified 2026-07-31
City of Airdrie · Verified listing source · Verified 2026-07-31
Data Center Map · Verified listing source · Verified 2026-07-31
City of Edmonton
Qu Data Centres · Verified listing source · Verified 2026-08-14
Qu Data Centres · Verified listing source · Verified 2026-08-14
Wolfpaw Data Centres · Verified listing source · Verified 2026-08-14
EPCOR · Verified listing source · Verified 2026-08-14
Data Center Map · Verified listing source · Verified 2026-08-14
City of Edmonton
Qu Data Centres · Verified listing source · Verified 2026-08-14
Qu Data Centres · Verified listing source · Verified 2026-08-14
Wolfpaw Data Centres · Verified listing source · Verified 2026-08-14
EPCOR · Verified listing source · Verified 2026-08-14
Data Center Map · Verified listing source · Verified 2026-08-14
Westlock County
Alberta Utilities Commission · Regulator · 2025-06-27
SAIDI (Canada) Ltd. · Regulatory filing · 2026-09-25
Alberta Utilities Commission · Regulator · 2026-10-08
Alberta Utilities Commission · Regulator · 2026-10-26
SAIDI (Canada) Ltd. and MAGA Energy Ltd. · Regulatory filing · 2026-10-29
Alberta Energy Regulator · Regulator · 2026-04-23
Alberta Energy Regulator · Regulator · 2026-09-09
Environment and Climate Change Canada · Government database · 2016-01-01
Government of Canada Open Government Portal · Government database · Modified 2026-06-29
Municipal District of Lesser Slave River No. 124
Alberta Electric System Operator · Verified listing source · Verified 2026-10-05
Alberta Electric System Operator · Verified listing source · Verified 2026-10-05
Millar Western Forest Products Ltd. · Verified listing source · Verified 2026-10-05
Municipal District of Lesser Slave River No. 124 · Verified listing source · Verified 2026-10-05
Wheatland County
U.S. Securities and Exchange Commission / Jet.AI Inc. · Verified listing source · Verified 2026-09-14
U.S. Securities and Exchange Commission / Jet.AI Inc. · Verified listing source · Verified 2026-09-14
Jet.AI Inc. · Verified listing source · Verified 2026-09-14
StratGrid Inc. · Verified listing source · Verified 2026-09-14
BetaKit · Verified listing source · Verified 2026-09-14
Government of Canada Open Government Portal · Verified listing source · Verified 2026-09-14
Sturgeon County
Sturgeon County · Municipal record · 2026-10-20
Sturgeon County Appeals Group / Land and Property Rights Tribunal · Tribunal filing · 2026-09-15
Sturgeon County · Municipal record · 2026-09-18
Sturgeon County · Municipal record · 2026-06-16
Sturgeon County · Municipal record · Updated through 2026-09-04
Meta · Company disclosure · 2026-07-08
Meta / Sturgeon County · Company disclosure · 2026-07
Sturgeon Data Centre · Company disclosure · Accessed 2026-07-22
Capital Power · Company disclosure · 2026-07-08
Alberta Utilities Commission · Regulator · Decision issued 2026-06-25
Alberta Utilities Commission · Regulatory filing · Accessed 2026-08-17
Alberta Utilities Commission · Regulator · 2026-06-25
Stantec for Greenlight Electricity Centre GP Ltd. / Alberta Utilities Commission · Regulatory filing · 2025-08-20
Pembina Pipeline Corporation · Company disclosure · 2026-07-02
Impact Assessment Agency of Canada · Federal filing · 2025-07-30
Sturgeon County · Municipal record · Accessed 2026-08-12
Government of Alberta Major Projects · Government database · Accessed 2026-07-22
Meta Data Centers · Company disclosure · 2026-07-08; accessed 2026-08-31
Clark Builders · Company disclosure · Undated; accessed 2026-08-31
Camrose County
Alberta Utilities Commission · Regulator · 2026-10-16
SunFavor AgriPower Camrose P1 Inc. / SCV Consulting Ltd. · Regulatory filing · 2026-08-13
SunFavor AgriPower Camrose P2 Inc. / SCV Consulting Ltd. · Regulatory filing · 2026-08-13
Alberta Utilities Commission · Regulator · 2026-10-23
Camrose County · Municipal record · 2025-11-25
Camrose County · Municipal record · 2025-11-25
Town of Olds
Town of Olds · Municipal record · Updated through 2026-08-15
Synapse Data Center / Town of Olds · Regulatory filing · 2026-03-18
Alberta Environment and Protected Areas · Regulator · Accessed 2026-08-15
Alberta Environment and Protected Areas · Regulatory filing · Accessed 2026-08-08
Synapse Real Estate Corp. · Regulatory filing · 2026-07-21
Town of Olds / Alberta Utilities Commission · Regulatory filing · 2026-05-29
Alberta Utilities Commission · Regulator · 2026-04-29
Alberta Utilities Commission · Regulator · 2026-08-17
Alberta Utilities Commission · Regulator · 2026-07-09
Synapse Real Estate Corp. / Alberta Utilities Commission · Regulatory filing · 2026-07-30
Calvin Consulting Group Ltd. for Synapse · Regulatory filing · 2026-06-12
Cambium Inc. for the Town of Olds · Municipal record · 2026-03-05
Englobe Corp. for the Town of Olds · Municipal record · 2026-03-20
Town of Olds · Municipal record · Accessed 2026-08-11
Town of Olds · Municipal record · Accessed 2026-07-23
Government of Alberta Major Projects · Government database · Accessed 2026-07-23
Town of Olds · Municipal record · Accessed 2026-08-12
Town of Olds / Invest Olds · Company disclosure · 2026-01-27
Synapse Data Center · Company disclosure · Accessed 2026-07-23
Global News · News reporting · 2026-08-18
Swan Hills region
Teton Digital · Verified listing source · Verified 2026-08-19
Impact Assessment Agency of Canada · Verified listing source · Verified 2026-08-19
Government of Alberta Major Projects · Verified listing source · Verified 2026-08-19
Alberta Electric System Operator · Verified listing source · Verified 2026-08-19
Alberta Utilities Commission · Verified listing source · Verified 2026-08-19
Municipal District of Greenview No. 16
Teton Digital · Verified listing source · Verified 2026-08-19
Teton Digital · Verified listing source · Verified 2026-08-19
Government of Alberta Major Projects · Verified listing source · Verified 2026-08-19
City of Edmonton
The Internet Centre · Verified listing source · Verified 2026-08-14
The Internet Centre · Verified listing source · Verified 2026-08-14
EPCOR · Verified listing source · Verified 2026-08-14
City of Edmonton
ThinkTel · Verified listing source · Verified 2026-08-14
Data Center Map · Verified listing source · Verified 2026-08-14
Inflect · Verified listing source · Verified 2026-08-14
EPCOR · Verified listing source · Verified 2026-08-14
Vulcan County
Vulcan County · Municipal record · Updated 2026-06
Palliser Grid / Vulcan County · Municipal record · 2026-01
Vulcan County · Municipal record · 2026-06-17
Court of King's Bench of Alberta · Court filing · Filed 2026-07-22
Government of Canada Open Government Portal · Government database · Modified 2026-06-29
Red Deer County
Red Deer County · Verified listing source · Verified 2026-10-10
Red Deer County · Verified listing source · Verified 2026-10-10
Red Deer County · Verified listing source · Verified 2026-10-10
Red Deer County · Verified listing source · Verified 2026-10-10
Wave Infrastructure · Verified listing source · Verified 2026-10-10
Red Deer County · Verified listing source · Verified 2026-10-10
Red Deer County · Verified listing source · Verified 2026-10-10
Town of Penhold · Verified listing source · Verified 2026-10-10
County of Wetaskiwin
County of Wetaskiwin · Verified listing source · Verified 2026-11-05
County of Wetaskiwin · Verified listing source · Verified 2026-11-05
County of Wetaskiwin · Verified listing source · Verified 2026-11-05
Ermineskin Cree Nation · Verified listing source · Verified 2026-11-05
City of Lethbridge
Whipcord Edge · Verified listing source · Verified 2026-09-01
Whipcord Edge · Verified listing source · Verified 2026-09-01
Whipcord Edge · Verified listing source · Verified 2026-09-01
City of Lethbridge · Verified listing source · Verified 2026-09-01
PeeringDB · Verified listing source · Verified 2026-09-01
Rocky View County
Rocky View County · Municipal record · Accessed 2026-09-11
Rocky View County · Municipal record · Approved 2025-07-08
Rocky View County · Municipal record · 2026-07-21
Wild Rose Data Center · Company disclosure · Accessed 2026-09-11
BHE Canada / Wild Rose Data Center · Company disclosure · Accessed 2026-09-11
Government of Alberta Major Projects · Government database · Accessed 2026-09-11
Alberta Electric System Operator · Regulator · 2026-09-01
EXP Services and Urbanics for Rocky View County · Municipal record · 2026-08-14
Rocky View County · Municipal record · 2026-09-23
Rocky View County · Municipal record · Accessed 2026-09-11
Government of Canada Open Government Portal · Government database · Modified 2026-06-29
City of Edmonton
Wolfpaw Data Centres · Verified listing source · Verified 2026-08-14
Wolfpaw Data Centres · Verified listing source · Verified 2026-08-14
Wolfpaw Data Centres · Verified listing source · Verified 2026-08-14
Data Center Map · Verified listing source · Verified 2026-08-14
EPCOR · Verified listing source · Verified 2026-08-14
Municipal District of Greenview No. 16
Municipal District of Greenview No. 16 · Municipal record · 2024-10-08
Municipal District of Greenview No. 16 · Municipal record · Passed 2024-11-12
Municipal District of Greenview No. 16 · Municipal record · 2024-10-22
Municipal District of Greenview No. 16 · Municipal record · 2024-11-12
Municipal District of Greenview No. 16 · Municipal record · 2025-03-25
Court of King's Bench of Alberta · Court filing · Filed 2026
Municipal District of Greenview No. 16 · Municipal record · 2024-12-09
O'Leary Digital / Municipal District of Greenview No. 16 · Company disclosure · 2026-05
Municipal District of Greenview No. 16 · Municipal record · 2026-05-28
Government of Alberta Major Projects · Government database · Accessed 2026-07-26
O'Leary Digital · Company disclosure · Accessed 2026-07-26
O'Leary Digital · Company disclosure · Accessed 2026-08-20
O'Leary Digital / Alberta Aboriginal Consultation Office · Regulatory filing · Recommendation issued 2026-04-15
Alberta Environment and Protected Areas · Regulator · 2026-03-31
Alberta Environment and Protected Areas · Regulator · 2025-04-07
Alberta Environmental Appeals Board · Regulator · 2026-04-17
Court of King's Bench of Alberta · Court decision · 2026-08-13
Government of Canada Open Government Portal · Government database · Modified 2026-06-29
Municipal District of Greenview No. 16 · Municipal record · Accessed 2026-07-26
Court of King's Bench of Alberta · Court filing · Filed 2026-09-29
Court of King's Bench of Alberta · Court filing · Filed 2026-10-15
Robert Davies, PhD; prepared for Sturgeon Lake Cree Nation's legal counsel · Independent assessment · 2026-06
Big Lakes County
Big Lakes County · Verified listing source · Verified 2026-09-24
Big Lakes County · Verified listing source · Verified 2026-09-24
Big Lakes County · Verified listing source · Verified 2026-09-24
No source records match those filters.